Two cycle routes are situated on both banks of the Hracholusky dam, No. 37 "Železná - Plzeň" and No. 2214 "Stříbro - Bezdružice". Their connection by new footbridge created an important connection, which made the whole tourist area of Pňovany and Bezdružice more attractive. The new footbridge is connected to the steel superstructure of the railway bridge. The footbridge has 5 spans with the lengths of fields 6.25 + 57.15 + 57.15 + 57.15 + 17.22 m. The foot bridge has been awarded as the construction of the 2020 year in Pilsen region.
